EV Charger Installation
With EV adoption surging across the GTA, a properly installed Level 2 charger transforms your daily driving experience — charging overnight in 4-8 hours versus 20+ hours on a standard outlet. Installation includes a dedicated 40-50A circuit from your panel, proper outdoor-rated conduit if needed, and coordination with your condo building if applicable. ESA permits are required.
Find an ElectricianWhat's Included
- Level 2 (240V) charger installation
- Dedicated 40-50A circuit from panel
- Panel capacity assessment and upgrade if needed
- Outdoor-rated NEMA 4 installations
- Condo and multi-unit parking solutions
- ESA permit and inspection included
Popular For
Other Electrical Service Services
Panel Upgrades & Breaker Replacement
Upgrade your electrical panel from 100A to 200A, replace fuse boxes, and install modern breaker protection for GTA homes.
Residential Rewiring
Complete knob-and-tube removal, aluminum wiring replacement, and whole-home rewiring to meet current Ontario electrical code.
Generator Installation
Whole-home standby generator installation with automatic transfer switches to keep your GTA home powered through outages and ice storms.
Lighting Installation & Design
Professional potlight, exterior, landscape, and LED lighting installation for Toronto homes, condos, and commercial spaces.
Emergency Electrical Repair
Same-day emergency electrical troubleshooting for power outages, sparking outlets, burning smells, and storm damage across the GTA.
Smart Home Wiring
Structured wiring, smart switches, home automation circuits, and network infrastructure for new and existing GTA homes.
Ready to Get Started?
Contact us today for a free estimate on your ev charger installation project. We'll connect you with experienced electrical service contractors in the Greater Toronto Area.